Welcome to Supexbond!

Supexbond Products Installation

Supex Cushion & SilverGuard Installation

 supex_silverguard2Supex Cushion

 

Installation:
Before you start, the subfloor must be level, sound, dry and clean. The temperature must be a least 18°C. The relative air humidity must lie between 30 and 60 per cent before, during and after installation – use a hygrometer to check this. If the relative air humidity is lower or higher the right climate should be achieved by humidifying or dehumidifying. This also goes for the room in which you store the packages. The packages must not be opened until immediately before installation.

Read more...

Supexbond Adhesives 3 in 1 Installation

Supexbond 3 in 1 Front Eng

SURFACE PREPARATION:

Your concrete, plywood, or other subfloor must be free from dirt, dust, oil, paint, sealants, glue, grease, and debris. Clean the subfloor using a vacuum, or sweep thoroughly. The area must be clean & dry; contaminate free.

BEFORE YOU BEGIN:

Installation starts with good planning. Plan your area & design first! Mark your area out on the subfloor with a chalk line, making sure that your starter row matches it. This will determine how straight your floor will appear in the room, as well as reduce the amount of ripping that would be needed for your last row. The starter row acts as a push point, so that the floor doesn’t move during the installation. After you have spread the mix over your starting area it is recommended that you use wood or plastic spacers between the plank and the walls - about every 3 feet. Once the starter row is secured, apply the adhesive system to the substrate/subfloor with our 1/4” V-Notch Trowel.

Read more...